|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
No recent main drain checks, total alkalinity or cyanuric acid checks. .2535(11) Provide record keeping including daily records of disinfectant residual, pH, drain cover/grate inspections, pool water maintenance, and temperature, if applicable. Provide weekly recordings for cyanuric acid and total alkalinity. - Pre-permit item. |
|
6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
Flow meter reading 69 GPM after a backwash. PDSC form submitted said flow meter read 55 GPM. .2539(c) All pools, prior to permit issuance, shall provide documentation to the Department to verify suction outlet safety compliance. - Pre-permit item. |
|
22
|
6
|
Premises: emergency telephone provided |
No |
No
|
No |
Emergency phone not functioning. .2530(f) Emergency phone shall remain operable. - Pre-permit item. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Fan not functioning in pump room. .2533(e) Provide continuous forced ventilation or cross ventilation in pump room. |