2
|
6
|
Water quality: disinfectant residual provided by |
No |
No
|
No |
Observed pool chlorine reading 0.6 ppm at start of inspection. CDI - corrected during inspection. CPO corrected chemicals and chlorine read above 10 ppm by end of inspection. He will continue to adjust before pool opens so that chlorine is at least 2.0 ppm but not so high as above 10.0. |
|
3
|
6
|
Water quality: pool water pH |
No |
No
|
No |
Observed pool pH reading leass than 6.8 at start of inspeciton. CDI - corrected during inspeciton. CPO adjusted chemicals and pH read 7.8 by end of inspection. |
|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
Obs.erved leaf debris inside pool and on floor of pool. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Obslerved flowmeter not operational at start of inspeciton. CDI - CPO repaired it and it was operational by end of inspection. |