|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
Chlorine, pH, drain/equalizer checks shall be checked daily. Cyanuric acid and Total Alkalinity shall be weekly. Keep daily writting records on site. Intent to suspend permit issued. Correct within 30 days. Return visit required. |
|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
Tiles on upper pool wall are missing. Repair. |
|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
Observed debris in skimmer baskets. Clean. |
|
11
|
2
|
Pool maintenance: diving equipment, ladders, steps and handrails properly placed, in good repair |
No |
No
|
No |
One ladder at pool was not secure at pool deck - it was moveable. Repair. |
|
13
|
4
|
Pool maintenance: contrasting band on steps and benches |
No |
No
|
No |
Observed contrasting band on steps fading. Repaint by next season. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
One gate was self-closing but not self-latching. 30 day intent to suspend issued. Return visit required.
Black metal gate and fence are only 46 inches high. Increase to 48 inches. 30 date intent to suspend issued. Return visit required.
Note: Below fence and gate is 4 inches. Approved because pool was built in 1985. |
|
26
|
2
|
Equipment room: valves and pipes identified by color codes or labels |
No |
No
|
No |
Relabel piping in pump room as it is faded. |
|
28
|
2
|
Dressing and sanitary facilities: bathhouse or rest rooms accessible; shower sign posted |
No |
No
|
No |
Observed no soap, paper towels or toilet paper in women's restroom. Observed no paper towels or soap in men's restroom.
Shower is broken/not operational. |