|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Rope part of ring buoy is dry rotted. ** Ring buoy replaced while on-site. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Multi-port valve on filter leaking. ** Repair/ replace valve. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Forced air vent not working. ** Repair/ replace. |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
Hot water ~135.6F @ lavatories & showers. ** Maximum allowed is 110F. |