|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
Observed equalizer lines plugged inside skimmers. **corrected during inspection.
Vacuum port attachment in place. **attachment removed & (proper) plug installed while on-site. |
|
10
|
2
|
Pool maintenance: safety ropes with floats and contrasting color bands provided at shallow area breakpoints |
No |
No
|
No |
Safety rope deteriorated. **replace. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Flow meter float stuck. **corrected while on-site. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Water pooled @ chemical room floor drain. (all chemicals elevated.) Per CPO, water pools after heavy rain, plumber has checked line & was unable to determine problem. **EHS to consult plumbing inspector. |