|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less. Observed ring buoy rope at initial length of 28’9” at start of inspection. CDI - CPO adjusted rope and removed knots and ties in rope length to extend ring buoy rope to proper permitted length (30’) |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
.2537(2) Decks shall be kept in good repair. Observed minor cracking in deck pavement, primarily at deck surrounding pool stairs. |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
.2526(m) Keep restrooms and fixtures clean and in good repair. Observed minor buildup on female restroom toilets. Clean as needed. |