|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
.2518(k) Replace missing weirs. Observed 2 out of 4 weirs missing. CDI - CPO installed both missing weirs |
|
11
|
2
|
Pool maintenance: diving equipment, ladders, steps and handrails properly placed, in good repair |
No |
No
|
No |
Observed both hand rails extremely loose on both ends and ladder also extremely loose and not secured. CDI - CPO was able to secured both handrails and ladders. |
|
12
|
4
|
Pool maintenance: inlets and other fittings in place and in good repair |
No |
No
|
No |
.2537(8) Fittings and/or face plates shall be replaced when damaged and kept in good repair. Observed four face plates loose and not secured. CDI -CPO secured all face plates for handrails and ladders |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less. Observed 1 out 2 ring buoy ropes at 45ft CDI - CPO reduced rope length to 39ft. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
.2518(g) Keep flow meter operational. Observed flow meter reading 0GPM and not moving at all. CDI - CPO installed new flow meter which resulted in 140GPM. |