|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Ring buoy straps broke when pulled on. CPO replaced ring buoy with new USCG approved ring buoy |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Flow meter stuck. Corrected during inspection |
|
27
|
2
|
Equipment room: filter backwash discharged through an air gap |
No |
No
|
No |
No air gap for backwash |