|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Observed ring buoy rope frayed. Replaced with new rope. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
.2518(g) Keep flow meter operational. Flow meter was not properly operating. Corrected during inspection. |
|
26
|
2
|
Equipment room: valves and pipes identified by color codes or labels |
No |
No
|
No |
.2518(d) Piping and valves shall be labeled with color codes or labels. Labeling faded and new piping was not labeled. Labeled all during inspection. |