3
|
6
|
Water quality: pool water pH |
No |
No
|
No |
.2535(1) Maintain pH at 7.2 to 7.8. Pool tested at 7.0. CDI PIC added soda ash and tested 30 min later at 7.2 |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less. Observed ring buoy rope exceeding the permitted 30 feet. CDI PIC corrected during inspection. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
.2528(a) Access gates shall swing away from the pool and be self-latching, self-closing unless an attendant AND lifeguard are present. One gate was not self latching. CDI PIC corrected and installed new gat latch during inspection. |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
.2537(2) Decks shall be kept in good repair. Observed 3inch diameter break in concrete near 3ft end on deck. |