Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
Logo Main Menu
Mecklenburg County Health Dept
Public Health Inspections
Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
  
 

Premises Information

Return to Inspections
NameMAA GATEWAY #2
Address120 N CEDAR ST
 
City/State/ZIP
CHARLOTTE NC 28202
Premise Type50 - Seasonal Swimming Pool
CountyMecklenburg
Inspection Date 6/17/2022
Final Score @ Grade
14
General CommentsPhil Stalnaker present during the inspection. Pool restrooms under renovation. Temporarily approved porta-john and sink located outside of the pool barrier in the walkway. Porta-john must remain clean for permit to be maintained. Billiard area/restrooms inaccessible to public from the pool. Door installed and self-closes, self-latches. Construction area must remain inaccessible to the public. Permanent windows installed that will not open. Once construction is complete, contact Katie Rudisill at 704-309-5494 to schedule a return inspection to final out renovation construction. Ensure restrooms have the following: 1) Floor shall be slip-resistant and sloped to drain. 2) Mirrors shall be shatterproof. No glass fixtures. 3) Provide hose bib with back flow prevention device. Pentair IntellifloXF VSF 022056 pump with (2) Lawson MLd-FG-1212 drain covers. EQ lines plastered on pool wall and plugged in skimmer. Permit issued for no night swimming. Sticker issued while onsite. The State permit should be available online by end of business today.

Violations

 
CDI=Corrected During Inspection  R=Repeat Violation  VR=Verification Required 
Violation Item Demerits Violation Description CDIRVRComments
16 4 Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained No No No Double doors with left door not latching. Corrected during the inspection. Back gate and front doors verified with battery back-up. Door from billiard room (new construction) verified to self-close, self-latch. Facility will install fob entry. Ensure battery back-up.
24 4 Equipment room: approved pump, filter, and flow meter operating properly No No No No spare pump basket. Provide spare pump basket by Friday, 24th or permit will be suspended.
25 2 Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure No No No Pump room floor wet. Keep dry. Clearance not provided around pool equipment. Provide 3 ft. Clearance around all equipment. Original construction.
29 2 Dressing and sanitary facilities: required fixtures provided, clean, and in good repair No No No Some trash in temporary approved restroom. Ensure restrooms are kept clean.
30 2 Dressing and sanitary facilities: approved water source, no cross connections No No No Check valve not ASSE1013. Original construction. If ever replaced, install ASSE 1013 check valve.