|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
Double doors with left door not latching. Corrected during the inspection. Back gate and front doors verified with battery back-up. Door from billiard room (new construction) verified to self-close, self-latch. Facility will install fob entry. Ensure battery back-up. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
No spare pump basket. Provide spare pump basket by Friday, 24th or permit will be suspended. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Pump room floor wet. Keep dry.
Clearance not provided around pool equipment. Provide 3 ft. Clearance around all equipment. Original construction. |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
Some trash in temporary approved restroom. Ensure restrooms are kept clean. |
|
30
|
2
|
Dressing and sanitary facilities: approved water source, no cross connections |
No |
No
|
No |
Check valve not ASSE1013. Original construction. If ever replaced, install ASSE 1013 check valve. |