Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
Logo Main Menu
Mecklenburg County Health Dept
Public Health Inspections
Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
  
 

Premises Information

Return to Inspections
NameWALNUT CREEK - PHASE I
Address6745 MALLARD PARK DR
 
City/State/ZIP
CHARLOTTE NC 28262
Premise Type50 - Seasonal Swimming Pool
CountyMecklenburg
Inspection Date 5/18/2026
Final Score @ Grade
18
General CommentsRestriction: Flow meter must remain operable. Flow shall be set at 78 gpm to 106 gpm to meet turnover and flow restriction of filter. Flow greater than 138 gpm exceeeds main drains. Suction Hazard. Construction: 7/1/2002 Rope: 32’ NIGHT SWIMMING NOT APPROVED.

Violations

 
CDI=Corrected During Inspection  R=Repeat Violation  VR=Verification Required 
Violation Item Demerits Violation Description CDIRVRComments
6 6 Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ No No No .2539(b) All suction fittings shall be installed in accordance with the manufacturer's instructions. GPM above required 80GPM setting. CPO corrected to 80GPM setting per approved PDSC.
11 2 Pool maintenance: diving equipment, ladders, steps and handrails properly placed, in good repair No No No .2521 Install ladders per manufacturer instructions. Ladders without end caps.
15 6 Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located No No No .2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less. Ring buoy rope extending past approved length. CPO cut and knotted rope to proper length.
16 4 Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained No No No .2528(b) Maintain no greater than 4" under fence and/or gate (pre-May 2010). Fence with clearance greater than 4” in areas around fence and near gate. CPO to move rocks to close gap under area.