|
2
|
6
|
Water quality: disinfectant residual provided by |
No |
No
|
No |
.2535(4) Maintain chlorine at least 1.0 ppm.
Observed chlorine at 0ppm upon arrival. -CDI- Chlorine was able to reach 3ppm by the end of the inspection. |
|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
.2518(k) Replace missing weirs.
Observed missing weir. -CDI- Weir was replaced. |
|
11
|
2
|
Pool maintenance: diving equipment, ladders, steps and handrails properly placed, in good repair |
No |
No
|
No |
.2521 Install ladders per manufacturer instructions.
Observed 2 loose ladders. -CDI- Ladders were tightened during inspection. |
|
12
|
4
|
Pool maintenance: inlets and other fittings in place and in good repair |
No |
No
|
No |
Observed VCGB able to be opened without a tool. -CDI- New fitting was installed during inspection. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less.
Observed buoy rope greater than 39 feet. -CDI- Rope was adjusted to 39 feet. |