|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
rope length corrected to 38' during inspection |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
window open to pool deck needs to be alarmed or not able to open > 4" ; corrected during inspection |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
natural cross or continuous forced ventilation required in equipment room |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
mirror to be of shatterproof construction; toilet needs to be repaired |
|
31
|
2
|
Dressing and sanitary facilities: sewage disposed of in a properly operating sewage system |
No |
No
|
No |
sewer clean out needs a new cap, current cap is broken |