|
3
|
6
|
Water quality: pool water pH |
No |
No
|
No |
.2535(1) Maintain pH at 7.2 to 7.8. pH measured 8.2 at beginning of inspection. CDI - Operator corrected to 7.8 during inspection. |
|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
.2537(14) Keep pool surface and pool floor free of debris. Floating debris in pool and debris on pool floor. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less. Rope attached to ring buoy measured 50 feet. CDI - Operator cut rope to 36 feet. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
.2518(e) Provide a spare basket for pump. No spare pump basket present at pool. Verification required by next week that spare pump basket is at pool. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
.2533(d) Pump room floor shall be kept dry and free of standing water. Standing water on pump room floor. |