|
6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
.2739 PDSC forms shall be updated. Observed pool with less than 2 equalizers and not following state requirements and pump is a Sta-Rite P4E6FL model and not P4E6GL. CDI equalizers permanently plugged during inspection. Facility needs to send in updated PDSC forms. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
.2528 Gates before 2010 hall have a gap of no more than 4''. Observed 8'' gap at bottom of the gate. CDI plywood drilled to bottom of gate. |
|
26
|
2
|
Equipment room: valves and pipes identified by color codes or labels |
No |
No
|
No |
.2518 Label pipes to show the flow of water on lines in pump room. Observed pipes that were not labeled. |