|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Observed 60 foot thow rope, cut to 50 feet as required. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Observed chemical bags stored on the floor of the pump room, items moved to the chemical room, and kept 6 inches off the floor |