| Violation Item
| Demerits
| Violation Description
| CDI | R | VR |
|
|
6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
PDSC form not provided. New covers installed. Corrected during inspection.
(2) Equalizer lines plugged in skimmer. Removed during the inspection to match PDSC form. Verified Pentair EQK750, 7.5 hp pump with (2) Aquastar 1216xxx drain covers. (10) Aquastar 6HPHAxxx equalizer line covers.
One skimmer equalizer >1/2" from wall. Corrected during the inspection. |
|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
(2) skimmer weirs stuck. Corrected during the inspection. |
|
9
|
4
|
Pool maintenance: depth markings and no diving markers or signs visible and properly located |
No |
No
|
No |
3 ft. depth marker and No Diving marker at far step entry fading and not 4". Corrected during the inspection. Re-sprayed. |
|
11
|
2
|
Pool maintenance: diving equipment, ladders, steps and handrails properly placed, in good repair |
No |
No
|
No |
Ladder rungs at >6" from pool wall. Maintain 3" to 6" between ladder rung and pool wall. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Ring buoy ropes >50 ft. Corrected during the inspection. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
Barrier <48" in height. Pool built 2000. Maintain 48" barrier.
Verified battery back-up present during the inspection. |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
Some deck drains with >1/2" between drains. Outside of required deck space. Required repair prior to 2022 operating permit. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
One pressure gauge with water. Continue to monitor to ensure operable. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Drain missing cover on floor drain. Hole in floor. Provide floor drain cover in pump room.
No fresh air intake in chemical storage room with forced draw. Recommend installing fresh air intake per mechanical code. |
|
30
|
2
|
Dressing and sanitary facilities: approved water source, no cross connections |
No |
No
|
No |
Hose bib in men's restroom and pump room without backflow prevention device. Provide backflow prevention devices on all hose bibs.
Check valve in pump room listed as ASSE 1015. Required ASSE1013. Original construction. If ever changed, bring up to current code. |
|
32
|
2
|
Dressing and sanitary facilities: floors smooth, slip-resistant, kept clean |
No |
No
|
No |
Flooring in restrooms with chipping seal and does not appear slip-resistant. Flooring shall be in good repair and slip-resistant. |