|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
.2537(14) Keep pool surface and pool floor free of debris. - Observed debris on the bottom of the pool floor. EHS was still able to see the pool floor and verify main drains. CPO will clean pool floor before opening. |
|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
.2518(k) Keep skimmers free of debris so skimmers are capable of operating per manufacturer instruction. - Observed debris in skimmer baskets. CDI- CPO removed debris. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less. - Observed ring buoy rope to be 50 ft. CDI- CPO provided rope at 36 ft. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
.2533(d) Pump room floor shall be kept dry and free of standing water. - Observed pump room floor with standing water. EHS did not observe any leaking pipes. |