|
3
|
6
|
Water quality: pool water pH |
No |
No
|
No |
Maintain pH between 7.2 and 7.8. Observed pH at 6.9. CDI-pH brought up to 7.2. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Maintain correct length of rope on ring buoy. Observed rope length at 50 feet. Pool is required to have rope at 36FT. CDI-rope cut to 36FT. |
|
27
|
2
|
Equipment room: filter backwash discharged through an air gap |
No |
No
|
No |
Provide air gap for pipe at backwash pit. Observed pipe down in open pit with no true air gap. |
|
30
|
2
|
Dressing and sanitary facilities: approved water source, no cross connections |
No |
No
|
No |
Provide back flow preventor on hose bibbs. Observed hose bibb next to restrooms with no backflow preventor. CDI-backflow preventor provided. |