|
3
|
6
|
Water quality: pool water pH |
No |
No
|
No |
.2535(1) Maintain pH at 7.2 to 7.8. PH was 7.1. CPO added Soda Ash during the permitting. PH reached 7.2 and stayed at 7.2 during multiple chemical checks. |
|
9
|
4
|
Pool maintenance: depth markings and no diving markers or signs visible and properly located |
No |
No
|
No |
.2523(c) Depth markers shall be 4 inches in height and of a contrasting color with the background, clearly visible. No Diving and 3ft depth marker verbiage was not easily visible in some places of the pool deck. CPO installed proper depth marker signage near depth markers that are not easily readable. (See General Comments for Guidance moving forward) |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less. Ring Buoy rope was 1ft shorter than what is required per their PDSC information. CPO placed new ring buoy rope at pool site that measures 29ft exactly. |
|
26
|
2
|
Equipment room: valves and pipes identified by color codes or labels |
No |
No
|
No |
.2518(d) Piping and valves shall be labeled with color codes or labels. Some of the arrows on the equipment pipes that identifies flow
were missing. CPO went and reinserted arrows to better illustrate filtration flow. |
|
27
|
2
|
Equipment room: filter backwash discharged through an air gap |
No |
No
|
No |
.2513(b) Filter backwash shall be discharged through an air gap. Discharge backwash pipe does not contain an air gap. |