6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
Main drain and equalizer line covers do not match what was on approved PDSC form. Correct PDSC form submitted and approved by CPO. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Throw rope 32 feet. Provide throw rope that is 30 feet. Corrected by CPO. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Flow meter stuck. Repair or replace. Corrected by CPO. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
General storage beside pool equipment. Maintain at least 3 feet clear walkway around equipment. |
|
27
|
2
|
Equipment room: filter backwash discharged through an air gap |
No |
No
|
No |
Provide air gap for backwash. |