|
6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
.2537(7) Drain covers shall be in good condition and securely attached. Equalizer cover is not fully secured to wall. Gap between equalizer cover and wall at the bottom of the equalizer and equalizer can be moved. Secure equalizer to wall. |
|
22
|
6
|
Premises: emergency telephone provided |
No |
No
|
No |
.2530(f) Emergency phone shall remain operable. Posted phone number at emergency phone does not call back to emergency phone. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
.2518(g) Keep flow meter operational. Flow meter not operational.
.2518(e) Provide a spare basket for pump. No spare basket for pump. |