|
12
|
4
|
Pool maintenance: inlets and other fittings in place and in good repair |
No |
No
|
No |
.2537(8) Fittings and/or face plates shall be replaced when damaged and kept in good repair.
Fitting for overflow gate missing and jagged. CPO removed jagged pieces of overflow gate during inspection. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less.
Rope exceeded required length. CPO corrected by cutting and knotting rope during inspection. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
.2533(b) Provide sufficient lighting in pump room.
Light not functioning during inspection. Door maintained open.
.2534(4) Provide storage for pool chemicals in waterproof containers or store up off the floor.
Chemicals on floor needing to be picked up. |