|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less.
Throw rope > 50'. CDI- Cut to 50' by CPO. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
.2537(b) All gates and doors shall be self-closing, self-latching.
.2528(b) Gates may only swing toward pool if built prior to May 2010 and natural topography, landscape, or egress prevents the gate from swinging away from the pool.
observed 2 locked pool gates. locks removed and observed to be self-closing and self-latching.
observed 2 gates swinging in toward the pool enclosure. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
.2533(b) Provide sufficient lighting in pump room.
No working lights in pump room. |
|
31
|
2
|
Dressing and sanitary facilities: sewage disposed of in a properly operating sewage system |
No |
No
|
No |
.2513(b) Overflow and discharges from the swimming pool shall be discharged through a suitable air gap.
No air gap at drain. |