|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
Scum on pool wall tiles. ** Clean.Chip out of pool wall tile at one ladder. ** Repair. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Throw rope on ring buoy 25'. ** Rope shortened to 23' while on-site. |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
Some deck furniture 5' from pool edge. ** Maintain 6' of clear walking space. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
No natural cross draft ventilation or forced air vent in equipment/ chemical room. (2 vents in door.) |
|
27
|
2
|
Equipment room: filter backwash discharged through an air gap |
No |
No
|
No |
Backwash pipe inserted into larger pipe in floor. ** Backwash water should discharge through a complete air gap. |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
Observed soil on lavatory in 1 restroom & soil on toilet in the other restroom. ** Clean.One restroom missing soap. ** Provide.Mirrors in restrooms are not shatterproof. |