|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
-- Gaps up to 9" under some areas of straight fence line. ** Fill dirt added while on-site. Compliance met.
-- 2 wrought iron gates. CPO reports that gate accessed via curve in road is kept locked due to safety concerns (blind spot). Gate that is used opens towards pool. ** Gate should open away from pool. Correction of gate swing direction would require wrought iron work. EHS' supervisor will make decision as to whether gate swing direction must be changed. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Flow meter float stuck. ** Corrected while on-site. |
|
27
|
2
|
Equipment room: filter backwash discharged through an air gap |
No |
No
|
No |
Filter backwash pipe is inserted into larger pipe in equipment room floor. ** Complete air gap should be present. |
|
30
|
2
|
Dressing and sanitary facilities: approved water source, no cross connections |
No |
No
|
No |
No back flow prevention on hose bib in chemical room (& pool water is added via hose). ** Install vacuum breaker. |