|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
.2518(g) Keep flow meter operational. Observed flow meter stuck. CDI: Flow meter operational by end of inspection.
.2518(e) Provide a spare basket for pump. Observed no spare pump basket. CDI: Basket provided. |