|
6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
.2539(b) All suction outlets shall be protected by anti-entrapment cover/grates in compliance with APSP-7.
skimmer equalizer lines were not plugged inside skimmer, only on pool wall.
CDI- pool operator plugged equalizer line inside skimmer during inspection. pool operator was instructed to follow state guidance for plugging equalizer lines inside skimmer (Disabling(Plugging)Skimmer Equalizer Lines memo). pool operator declined to drain lines prior to plugging. (lines should be free of water due to potential freezing). guidance document attached to email. |
|
22
|
6
|
Premises: emergency telephone provided |
No |
No
|
No |
.2530(f) Pool telephone shall be capable of directly dialing 911 or another emergency notification system.
pool emergency phone directly dialed the hotel front desk.
CDI- pool operator contacted phone company and was corrected. phone now has dial tone and successfully connected to 911 after dialing.
.2530(f) Signage with legible letters providing dialing instructions, address of pool and pool telephone number shall be posted at the emergency phone. phone signage did not respresent proper instructions for contacting 911.
CDI- phone sign changed informing bathers to dial 911. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
.2533(d) Pump room floor shall be kept dry and free of standing water.
observed water on floor in pump room. |