|
6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
Missing 2 equalizer covers. Equalizers were replaced during inspection. Corrected |
|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
Missing (4) four weirs. Weirs were replaced during inspection. |
|
12
|
4
|
Pool maintenance: inlets and other fittings in place and in good repair |
No |
No
|
No |
Missing (2) return outlets. Outlets replaced during inspection. |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
Metal cover on deck needs to be counter sunk and attached to deck or filled in with concrete. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Flow meter in pump room was stuck. Perform maintenance. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Repair fan in pump room and install fan for chemical room by 2016 season. |