|
6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
Equalizer had expired. 2 replaced during inspection. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Ring buoy rope was fraying. Buoy replaced during inspection. |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
Regrout cracks in concrete and replace missing/broken expansion joints. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Repair ventilation in chem/storage room. Clean up excess debris in storage. |