|
3
|
6
|
Water quality: pool water pH |
No |
No
|
No |
.2535(1) Maintain pH at 7.2 to 7.8. Observed pH at 8.2. PCO corrected concentration to 7.6 by the end of permitting. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Lifesaving equipment includes body hook and pole and USCG approved ring buoy with required rope length. Observed ring buoy with fraying rope around the brackets. PCO replaced ring buoy on site during permitting. |
|
22
|
6
|
Premises: emergency telephone provided |
No |
No
|
No |
.2530(f) Emergency phone shall remain operable. Observed emergency phone not ringing when EHS calls back posted number. EHS picked up phone and can hear talking through the other end. Key to adjust ringer on phone was stuck. PCO replaced phone during permitting. Phone rang when EHS called number posted. |