|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Small leak on filter-parts have already been ordered |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Light should be hard-wired to a switch |
|
31
|
2
|
Dressing and sanitary facilities: sewage disposed of in a properly operating sewage system |
No |
No
|
No |
Backwash line discharges to storm drain in street that staff indicated is plumbed to irrigation pond on site |