2
|
6
|
Water quality: disinfectant residual provided by |
No |
No
|
No |
Observed chlorine at 0.4ppm. CDI, operator was able to adjust chlorine to 1.5ppm while on-site. |
|
6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
Pool pump model is incorrect on PDSC form. Using pump identification booklet, actual Sta-Rite pump model is P2RA5YGL. New PDSC form being completed on site and pending approval. Updated PDSC form must be submitted and approved by MCHD prior to pool permit being issued. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Observed throw rope greater than 26 ft. and at 27.5 feet. CDI, operator provided new throw rope at required footage. |