|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less. Observed rope for ring buoy that was too long. CDI: Rope shortened during inspection. |
|
22
|
6
|
Premises: emergency telephone provided |
No |
No
|
No |
.2530(f) Pool telephone shall be capable of directly dialing 911 or another emergency notification system. Observed that when Kings III provider attempts to connect to local 911, the transfer cannot be completed. A play back message of “This device has not been set up..” is said through the box. Phone is able to be called back to. CDI: Phone was repaired by technician remotely during inspection. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
.2533(b) Provide sufficient lighting in pump room. Observed lightbulb in pump room is burnt out. |