|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Provide throw rope length at 45 ft. Observed throw rope length at 42ft. Stretched and corrected to 45ft during inspection. Maintain body hook in good repair. Observed body hook missing one screw. Screw replaced during inspection. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Observed that there is no forced air or cross ventilation in chemical room. |