| Violation Item
| Demerits
| Violation Description
| CDI | R | VR |
|
|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
One tile missing on pool wall. Does not present hazard. Replace tile. |
|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
One weir missing from skimmer (1 of 3). Replace skimmer weir. |
|
9
|
4
|
Pool maintenance: depth markings and no diving markers or signs visible and properly located |
No |
No
|
No |
No Diving previously sprayed with lettering <4" and >25 ft. apart. Added No Diving international stickers. Due to rain, not sticking properly. International No Diving shall be on at least 6"x6" tile. Given 30 days to correct to meet code. 30 day follow-up.
.2523(d) No Diving markers shall be written in four inch letters or international 6"x6" no diving in red and black on a white background. |
|
11
|
2
|
Pool maintenance: diving equipment, ladders, steps and handrails properly placed, in good repair |
No |
No
|
No |
Ladder rungs >6" from pool wall. Maintain 3" to 6" from rung to wall. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
New fencing installed. All items corrected from previous visit except for back tie in to building. Onsite visit with fence contractor to discuss repair. Given 30 days to bring up to code. Resolution discussed. 30 day follow-up.
Electrical Conduit outside of barrier provides foothold. Original to property. Pool built in 1985. Conduit is blocked by large bushes that surround the swimming pool. If bushes ever removed, repair will be required for conduit foothold. |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
Decking pooling water around deck drains. Some decking popping up. No offsets >1/2". Repair decking and drains so that deck drains properly by 2021 operating season. Repair will be required. |
|
23
|
4
|
Equipment room: chlorine or bromine automatic feeders that meet NSF Standard 50 |
No |
No
|
No |
No flow meter on chlorinator. If replaced, install flow meter per mfg. instructions. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
No ventilation in pump room. Provide continuous forced ventilation or cross ventilation. |
|
27
|
2
|
Equipment room: filter backwash discharged through an air gap |
No |
No
|
No |
No air gap at backwash line. Provide air gap. |
|
30
|
2
|
Dressing and sanitary facilities: approved water source, no cross connections |
No |
No
|
No |
Hose bib near pump room without backflow prevention. Provide backflow prevention device. |