|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Observed throw rope > 26ft. Maintain rope length at required 26ft. CDI: rope shorten to 26ft during inspection. |
|
26
|
2
|
Equipment room: valves and pipes identified by color codes or labels |
No |
No
|
No |
Re-label pipes in pump room. Observed some labels unclear on some pipes. |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
Observed water in restrooms at 130F. Maintain water in restrooms no greater than 110F. |