|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
Deck chipped near skimmer at right side pool creating >1/2" offset. ** Corrected during inspections. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
-- No natural cross draft ventilation or operable forced air ventilation in equipment/ chemical room. ** Provide.
-- Leak at junction circulation pump & pipe leading to filter.
** Keep equipment/ chemical room dry. Resolve. |
|
27
|
2
|
Equipment room: filter backwash discharged through an air gap |
No |
No
|
No |
Circulation system backwash pipe inserted down into larger pipe in floor. ** Backwash water should discharge through a complete air gap. |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
Shower inoperable. CPO reports that shower has been shut off due to plumbing leak. ** Resolve. |