|
6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
.2539 - Observed equalizer lines not blocked/plugged in skimmer under basket as indicated disabled by PDSC. Eq line on wall has been plastered. CPO fitted plugs into skimmer equalizer lines during inspection. |
|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
.2518(k) Replace missing or damaged skimmer basket.
Observed 1 of 4 skimmer baskets damaged and cracked. CPO replaced on site - Corrected |
|
11
|
2
|
Pool maintenance: diving equipment, ladders, steps and handrails properly placed, in good repair |
No |
No
|
No |
.2521(b) Ladders shall have slip-resistant tread. - Observed one ladder step without slip resistant tread. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less.
Observed ring buoy throw rope >36’. CPO cut rope to correct length during inspection - Corrected. |