3
|
40
|
DRINKING FOUNTAINS: Clean and in good repair 40#; adequate pressure, properly regulated 40# (.2406) |
No |
No
|
No |
-Observed 2 water fountains with high pressure in building 4. Regulate.
Drinking fountains shall be provided with adequate water pressure and be properly regulated (i.e. water pressure should be regulated so that an individual’s mouth does not come in contact with the nozzle and so that the water does not splash on the floor). 15A NCAC 18A 2406 (b).
-Observed pink buildup on the mouthpieces of the fountains in building 1. Clean.
Drinking fountains shall be kept clean and in good repair. 15A NCAC 18A .2406 (b). |
|
5
|
15
|
LAVATORY FACILITIES: Fixtures clean and in good repair 30#; soap and individual towels or approved hand-drying devices provided 40# (.2409) |
No |
No
|
No |
-Observed all of the spring loaded faucets with short runtimes in building 4 restrooms. Regulate to provide a minimum of 15 second runtime to facilitate proper handwashing.
-Observed grass in two of the sinks in the boy's restroom in building 4. Clean.
-Observed the sink separating from the wall in building 5 restroom. Replace & Recaulk.
Fixtures shall be kept clean and in good repair. 15A NCAC 18A .2409 (b). |
|
6
|
15
|
FLOORS: WALLS: AND CEILINGS: Floors, walls, and ceilings clean and in good repair 30# (.2410) |
No |
No
|
No |
-Observed tissue wads on the wall in the boy's restroom in building 4. Clean.
-Observed a broken light cover in the boy's restroom in building 4. Replace.
-Observed stained carpeting in all buildings except 5 (5 has new carpeting).
-Observed stained ceiling tiles in the hall of building 2 and in room 102. Replace the tiles. Do not spray paint over the stains. (New tiles onsite).
Floors, walls, and ceilings of all areas shall be kept clean and in good repair. 15A NCAC 18A .2410. |
|
11
|
15
|
PREMISES: MISCELLANEOUS: Premises neat, clean 30#; no vector breeding or harborage 20#; pesticides and other toxic materials properly handled and stored 30* (.2415) |
No |
No
|
No |
Observed a cap removed from the sewage pipe and toilet tissue on the ground around it on the side of building 5. Replace the cap and clean the surrounding ground. Per the Principal, the work was being done on the piping this past week and is now completed. He stated that there is no sewage backup issue-the pipe was broken during the field clearout and replaced.
The premises of the school under control of the principal shall be kept neat and clean at all times. 15A NCAC 18A .2415 (a). |