|
4
|
50
|
TOILET FACILITIES: Walls and ceilings clean, nonabsorbent, washable, and in good repair 30#; fixtures clean and in good repair 40#; floors impervious, kept clean 30# (.2408) |
No |
No
|
No |
Thoroughly clean walls and ceiling throughout in all bathrooms. Tighten loose toilet seats on toilets. Repair latching device on stall doors. Thoroughly clean stall fixture and repair stall doors so they will open the correct way. Replace toilet paper holders in bathrooms. Replace missing clean out cover on wall in bathroom.
Walls and ceilings of toilet facilities shall be constructed of non-absorbent, washable materials and shall be kept clean. 15A NCAC 18A .2408 (b).
Toilet fixtures shall be kept clean and in good repair. 15A NCAC 18A .2408 (d). |
|
5
|
15
|
LAVATORY FACILITIES: Fixtures clean and in good repair 30#; soap and individual towels or approved hand-drying devices provided 40# (.2409) |
No |
No
|
No |
Repair hand washing sink in boys bathroom near C16. Thoroughly clean hand washing sink around/near base of faucet fixture. Clean hand washing sinks in classrooms even if not being used.
Fixtures shall be kept clean and in good repair. 15A NCAC 18A .2409 (b). |
|
6
|
15
|
FLOORS: WALLS: AND CEILINGS: Floors, walls, and ceilings clean and in good repair 30# (.2410) |
No |
No
|
No |
Clean floors and walls throughout in classrooms. Thoroughly clean wall behind trash can storage areas in rooms. Repair any and all roof leaks in classroom and hallway area, then replace ceiling tiles. PLEASE ADDRESS SERIOUS . ROOF LEAK ON SECOND FLOOR IN HALLWAY AREA. LARGE TRASH CAN IS BEING USED IN HALLWAY TO CATCH LEAKING WATER FROM CEILING. Repair loose runner on step to stage area.
Floors, walls, and ceilings of all areas shall be kept clean and in good repair. 15A NCAC 18A .2410. |