|
20
|
0
|
No identified lead poisoning hazards in accordance with NCGS 130A-131.7(7): .2816 |
No |
No
|
No |
Observed last water lead testing on 6/23/24. Provided website to director during the inspection. Sample kit requested.
**15A NCAC 18A .2816 (b) (1) Child care operators, as defined under G.S. 110-86(7), shall test, once every three years, all water outlets used for drinking or food preparation. Samples shall also be collected and tested within 30 calendar days of completion of any renovations or repairs that may impact the facility's drinking water infrastructure, such as repair or replacement of all or part of drinking water service lines or faucets, at impacted outlets. The operator shall provide documentation of testing results for review by the Department during each unannounced routine sanitation inspection. |
|
21
|
4
|
Properly sized, located, accessible, and in good repair; sinks, toilets and potty chairs cleaned and disinfected; proper change of use procedure: .2817, .2818, .2836 |
No |
No
|
No |
Observed hand washing sink faucet in need of repair in the school age restroom.
**15A NCAC 18A .2818 (a). Lavatories shall be kept clean and in good repair |
|
27
|
4
|
Free of storage and in good repair; cleaning and disinfecting solutions labeled; approved diapering methods used; diaper changing and handwashing signs posted: .2817, .2818, .2819, .2820, .2836 |
No |
No
|
No |
Observed diaper changing pad in need of repair in the toddler room.
**15A NCAC 18A .2819 (b). Diapering surfaces shall be made of smooth, intact, nonabsorbent material and shall be kept clean and in good repair. |
|
37
|
0
|
Easily cleanable, clean, and in good repair; carpets vacuumed as required and extraction cleaned; date cleaned___________: .2824, .2825, .2832, .2836 |
No |
No
|
No |
Observed touch up paint needed in the after school room.
**15A NCAC 18A .2825 (a) In child care centers, the walls and ceilings, including doors and windows, of all rooms and areas, shall be kept clean, free of visible fungal growth, and in good repair. All walls and ceilings shall be free of peeling, flaking, chalking, or otherwise deteriorating paint. |