|
51
|
0
|
Plumbing installed; proper backflow devices |
Yes |
No
|
No |
5-202.14 Prevent backflow or back siphonage prevention devices installed shall meet American Society of Sanitary Engineering standards. -P
Observed hose nozzle under pressure with no backflow prevention device present. EHS discussed backflow requirements with PIC. (0 pts) |
|
55
|
1
|
Physical facilities installed, maintained & clean |
No |
Yes
|
No |
6-101.11/6-201.11 Floors, walls and ceilings shall be designed, constructed, and installed so they are smooth and easily cleanable. Floors shall be non-absorbent in areas subject to moisture.
Observed floor made of absorbent concrete. Floors must be made non-absorbent and easily cleanable. REPEAT*** |