|
10
|
1
|
Handwashing sinks supplied & accessible |
Yes |
No
|
No |
6-301.12 Provide paper towels or approved alternative for hand drying at each handsink. -Pf Observed no paper towels or other alternative at both hand sinks.CDI PIC did bring over a roll of paper towels. |
|
55
|
0.50
|
Physical facilities installed, maintained & clean |
No |
No
|
No |
6-501.11 Floors, walls, and ceilings including the attachments such as soap and towel dispensers; light fixtures; and heat/ac vents shall be maintained in good repair. Observed paper towel dispenser not work. Work order has been put in. Repeat. |