|
55
|
1
|
Physical facilities installed, maintained & clean |
No |
Yes
|
No |
6-101.11/6-201.11 Floors, walls and ceilings shall be designed, constructed, and installed so they are smooth and easily cleanable. Floors shall be non-absorbent in areas subject to moisture. Observed baseboard tiles peeling away from freezer wall and grout missing in between floor tiles in various areas, heavily in dish washing area. Repeat. |