Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
Logo Main Menu
Mecklenburg County Health Dept
Public Health Inspections
Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
  
 

Premises Information

Return to Inspections
NameCOOK OUT #44
Address9705 N TRYON ST
 
City/State/ZIP
CHARLOTTE NC 28262
Premise Type1 - Restaurant
CountyMecklenburg
Inspection Date 2/11/2019
Final Score @ Grade
96 A
General Comments

Violations

 
CDI=Corrected During Inspection  R=Repeat Violation  VR=Verification Required 
Violation Item Demerits Violation Description CDIRVRComments
18 3 Proper cooling time and temperatures Yes Yes Yes 3-501.14(B) Quickly cool TCS foods that are prepared from room temperature ingredients. Food must be to 41F within 4 hours. -P Observed 2 deep and covered tubs of lettuce cooling approx. 4 hrs that were 46 degrees. CDI- Lettuce moved to shallow pans, observed at 41 degrees 15 min. later. Observed bbq in a deep pan that is prepared at room temp, in walk in cooler at 46 degrees cooling approx. 4 hrs. CDI- Bbq moved to shallow pans. (repeat) 3-501.14(A) Quickly cool cooked foods within 2 hours from 135F to 70F; and within a total of 6 hours from 135F to 41F. -P Observed chili with meat added, cooling approx. 7 hrs at 45 degrees. CDI- As food had met min. 45 degrees allowed PIC to spread chili in shallow pans and place in freezer. Observed at 41 degrees by end of inspection.
31 1 Proper cooling methods used; adequate equipment for temperature control Yes Yes No 3-501.15 Quickly cool foods. Use methods such as open/vented shallow pans, large ice baths and active stirring. Cold air must flow around product to remove the heat. -Pf CDI- Observed a few instances of foods cooling in deep containers with lids and stacked on top of other pans. CDI- Reviewed proper cooling methods with PIC. PIC used proper cooling methods to finish cooling the actively cooling foods. (repeat) GENERAL COMMENT: Due to repeat cooling violations, will follow up within 10 days that facility is using proper cooling procedure.