|
41
|
0.50
|
Wiping cloths: properly used & stored |
No |
No
|
No |
3-304.14(B) Hold in-use wiping cloths in properly concentrated sanitizer between uses.
Observed multiple in-use wiping cloths stored on non-food contact surfaces of cooking equipment and cold holding/hot holding units.
Keep all in-use wiping cloths stored inside properly concentrated sanitizer buckets. |
|
47
|
0
|
Equipment, food & non-food contact surfaces approved, cleanable, properly designed, constructed & used |
No |
Yes
|
No |
4-501.11 Maintain equipment in good repair.
Observed loose faucet base at the 3-compartment sink.
Repair/tighten so that it is smooth and easily cleanable.
REPEAT VIOLATION.
*Note: Although a repeat violation, EHS not deducting points today since different equipment was observed in need of repair today. |
|
49
|
0.50
|
Non-food contact surfaces clean |
No |
No
|
No |
4-601.11(C ) Keep non food contact surfaces of equipment clean to avoid build up of dust, food residue or debris.4-602.13 Non food contact surfaces of equipment shall be cleaned frequently to preclude accumulation of soil residues.
Observed soiled gaskets in cold holding units throughout the facility. Observed food debris accumulating on interior surfaces of standing reach-in freezer. Observed dust buildup on shelves in dry storage rack.
Increase cleaning frequency. |
|
53
|
0
|
Toilet facilities: properly constructed, supplied & cleaned |
No |
No
|
No |
5-501.17 Provide a covered waste bin in female restrooms.
Observed no covered waste bin inside the female restroom. Lid on the waste bin available at the restroom is open in the middle.
Obtain a fully covered waste bin for proper disposal of sanitary napkins. |
|
55
|
0
|
Physical facilities installed, maintained & clean |
No |
No
|
No |
6-201.16 (A) Wall and ceiling covering materials shall be attached so that they are easily cleanable.
Observed a section of the ceiling tiles in the dining room missing. PIC stated that they had a leak and the work order has been placed and showed EHS text where PIC's boss stated the maintenance employees would arrive on-site at 4:00PM today to work on the ceiling. |