|
15
|
0
|
Food separated & protected |
Yes |
No
|
No |
3-302.11(A)(1) Separate raw animal foods from ready-to-eat foods and washed/unwashed fruits and vegetables. -P -Observed raw bacon stored above ready-to-eat biscuits in the reach-in cooler. Observed raw chicken stored above ready-to-eat foods in the reach-in freezer. -CDI- PIC corrected storage order.
For more information on food storage order please visit: https://health.mecknc.gov/envhealth/food-and-facilities-sanitation |
|
16
|
1.50
|
Food-contact surfaces: cleaned & sanitized |
No |
Yes
|
No |
4-602.11 (E )Clean the equipment and utensils used with nonTCS foods as required to avoid contamination. -Observed dark buildup on interior of ice machine, which is used for customer drinks. Increase frequency of cleaning ice machine to prevent residue accumulation. -REPEAT- |
|
35
|
0
|
Approved thawing methods used |
No |
No
|
No |
3-501.13 (E ) Reduced oxygen packaged fish, required to be kept frozen until time of use per labeling, shall be removed from the reduced oxygen environment prior to thawing under refrigeration or upon completion of thawing using running water. -Observed raw salmon thawing within ROP bag environment. Ensure raw fish is removed from ROP environment (by exposing the fish to outside air) prior to thawing. |
|
47
|
1
|
Equipment, food & non-food contact surfaces approved, cleanable, properly designed, constructed & used |
No |
Yes
|
No |
4-501.11 Maintain equipment in good repair. - Observed torn gasket on right door of 3-door upright cooler door. Replace torn gasket.
REPEAT |
|
55
|
0
|
Physical facilities installed, maintained & clean |
No |
No
|
No |
6-101.11/6-201.11 Floors, walls and ceilings shall be designed, constructed, and installed so they are smooth and easily cleanable. Floors shall be non-absorbent in areas subject to moisture. - Observed floor tile damage in upstairs kitchen area. Repair damaged floor tiles. -REPEAT- Observed significant improvement in this violation from the past inspection (sink re-caulked to the wall, walls/floors cleaned to prevent buildup of dark residue). Facility is scheduled to undergo extensive renovations in January 2027, wherein floors/walls will be redone. |