|
55
|
0
|
Physical facilities installed, maintained & clean |
No |
No
|
No |
6-501.11 Repairing - Premises, Structures, Attachments, and Fixtures - Methods (C)
Observed peeling paint in the dry storage room of the cafeteria. Also observed the walls of the dinning area of the cafeteria with chipping paint. All physical facilities shall be maintained in good repair. |